We are not solicitors. This site is free information only. We do not take claims, we do not pass your details to anyone, and we never ask you to sign anything. Who we are

East Riding of Yorkshire: damp and repairs

What East Riding Of Yorkshire Council publishes about its own performance, the deadlines that bind it, and the free routes when repairs stall.

This page applies to England. The law is different in Wales, where Awaab's Law does not apply at all. See our Wales guidance.

Homes
11,275Social rented, 2024-25
Their repair target
56 daysNon-emergency, their own
Failing decency
2.8%Median council: 3.3%

What stands out in East Riding of Yorkshire's figures

A low stock condition figure, with the usual caveat

East Riding of Yorkshire reported 2.8% of homes failing the Decent Homes Standard, below the council median of 3.3%. Worth knowing that landlords assess their own stock and the regulator publishes what it receives without auditing it, so a low figure can mean good homes or can mean not every home has been surveyed.

Their repair target is 56 days, which is on the long side

The median across the 178 landlords in this data is 28 days. East Riding of Yorkshire met its own target 99% of the time in 2024-25, but that performance is measured against a bar set more generously than most.

They report hitting their repair target almost every time

99% of non-emergency repairs completed within target, against a median of 82.5%. Figures that high are worth reading alongside the length of the target itself, which is 56 days, and what tenants said: satisfaction with the time taken was 74.7%.

The first stage works, the escalation is where it stalls

82.3% of stage one complaints were answered on time but only 45.5% at stage two. If you escalate, diarise the date. A stage two that drifts past its deadline is your cue to go to the Housing Ombudsman Service rather than wait politely.

These scores came from a telephone survey

The regulator cautions against comparing landlords on individual measures without allowing for how the survey was run. East Riding of Yorkshire's was predominantly telephone, and method affects who answers: telephone surveys tend to reach people who pick up to an unknown number. Region, tenant age and the share of supported housing all move these numbers too.

Which benchmark you use changes the answer

Against the all-landlord median of 0.5% in the table below, East Riding of Yorkshire's 2.8% looks poor. Against other councils, where the median is 3.3%, it looks good. Councils and associations are not alike on stock condition and the council figure is the fairer comparison here.

What binds them regardless

Those 56 days are a service promise East Riding of Yorkshire made to itself. Awaab's Law is different, because it is law and it overrides them. Emergency hazards: 24 hours to investigate and make safe. Damp or mould posing a significant risk of harm: 10 working days to investigate, a written summary within 3 working days of finishing, safety work started within 5. When the clock actually starts.

East Riding of Yorkshire's 2024-25 return in full

MeasureEast Riding of YorkshireSector median
Stage 2 complaints answered in time 45.5%
43.4 points worse than the median
88.9%
Non-emergency repairs inside their own target 99%
16.5 points better than the median
82.5%
Satisfaction that the home is well maintained 81.5%
9.6 points better than the median
71.9%
Satisfaction that the home is safe 87%
9.4 points better than the median
77.6%
Stage 1 complaints answered in time 82.3%
7.6 points worse than the median
89.9%
Satisfaction with the repairs service 79.1%
5.5 points better than the median
73.6%
Satisfaction with time taken on the last repair 74.7%
5.2 points better than the median
69.5%
Satisfaction with the approach to complaints 40.2%
4.7 points better than the median
35.5%
Emergency repairs inside their own target 98.2%
3.3 points better than the median
94.9%
Homes not meeting the Decent Homes Standard 2.8%
2.3 points worse than the median
0.5%
86 landlords reported worse Non-decent homes, every landlord ranked

If a repair is not happening

Put it in writing and keep the reference. East Riding of Yorkshire completes 99% of routine repairs inside its own target, so a repair that has stalled is unusual here and saying so is useful: you are describing an exception to their own published performance, not a general complaint about the service. Escalate to a formal complaint if the first written report goes nowhere.

How council complaints work, and after that the Housing Ombudsman Service, which is free, can order the repair as well as compensation, and takes no percentage. What to ask before signing with anyone.

If it is damp or mould Start here, whoever your landlord is

Common questions

What is East Riding of Yorkshire's target for a repair?

56 days for a non-emergency responsive repair, and 24 hours for an emergency. They met the non-emergency target 99% of the time in 2024-25. The median target across the 178 landlords we hold data for is 28 days.

This is their own service target, not a legal deadline. The law requires repairs in a reasonable time, which is not defined and depends on the problem.

How many East Riding of Yorkshire homes fail the Decent Homes Standard?

320 of 11,275, which is 2.8%. The median council reported 3.3%.

These are self-reported figures and the regulator publishes them without auditing them, so they are a reasonable basis for a question and a poor basis for a conclusion. Every landlord ranked on this measure.

What if East Riding of Yorkshire misses a deadline?

Complain formally, using the words "I am making a formal complaint", then escalate to stage two, then take it to the Housing Ombudsman Service. All three are free and you keep every penny of any award. East Riding of Yorkshire answered 82.3% of stage one complaints in time in 2024-25, so diarise your dates.

Do these figures measure damp and mould?

No. There is no damp and mould measure anywhere in the Tenant Satisfaction Measures, for this landlord or any other. Damp can make a home fail the Decent Homes Standard through the hazard route, but nothing here counts damp cases.

Figures contain public sector information licensed under the Open Government Licence v3.0. Source: Regulator of Social Housing, Tenant Satisfaction Measures 2024-25 (v1.1), published 4 November 2025. Reported by the landlord for the year to 31 March 2025 and not independently audited.